VIEN

SPECIFICATIONS:

  • Waiting dry time before sanding: 90 -120 mins

  • Surface dry time: 15-20 mins

  • Waiting dry time for packaging: 48-72 hours   

SUPERIOR FEATURES : 5 IN 1

    1. Environment friendly
    2. Good elastical paint layer
    3. High color durability
    4. Good cohesion
    5. Anti mould

BLENDING INSTRUCTION:

Products Quick dry Slower dry Applying method Blending ratio
Pu Primers 612G 611 Pu Primer  + Hardener OL 17 + Thinner 2  :    1     :   2.5-3
Pu Matte Coatings 712 711 Matte Pu Coating + Hardener OL 17 + Thinner 2  :  0.8-1 :   3
PU Glossy Coatings 2247/2099B 2007 Glossy Pu Coating + Hardener OL 17 + Thinner 2  :  0.8-1 :   3

Note: the blending ratio may be changed by using demand