VIEN

SPECIFICATION:

  • Drying time before sanding: 120 – 180 mins
  • Surface drying time: 12-20 mins
  • Drying time before packaging: 72 - 96 hours 

SUPERIOR FEATURES: 7 in 1

  1. Environment friendly
  2. Very high UV resistance
  3. Good elastic paint layer
  4. High cohesion
  5. High color durability
  6. Sustain to the saltiness
  7. Anti mold

 

BLENDING INSTRUCTION:

Products

Code

Using method

Blending ratio

PU Primer

609

Pu Primer + Exterior primer hardener + Thinner

2  :    1     :   2.5-3

PU matte coating

709

PU matte + Harderner OL 07 + Thinner

2  :  0.8-1 :   3

Note: the blending ratio can be adjusted as user demand