VIEN

SPECIFICATIONS:

  • Drying time before sanding: 90-120 mins
  • Surface drying time: 12-20 mins
  • Drying time before packaging: 48-72 hours.

SUPERIOR FEATURES: 5 IN 1

  1. Environment friendly
  2. Good elastical paint layer
  3. High color durability
  4. Good cohesion
  5. Anti mould

MIXING INSTRUCTION:

Products Quick dry Slower dry Using method Mixing ratio
Pu Primer 612G 611 Pu Primer + Hardener  OL 17 +Thinner 2  :    1     :   2.5-3
Pu Matte coating 712 711 Pu Matte coating+ Hardener  OL 17 +Thinner 2  :  0.8-1 :   3
Pu Glossy coating 2247/2099B 2007 Pu Glossy coating+ Hardener  OL 17 +Thinner 2  :  0.8-1 :   3
Color essence Premium interior colors Premium interior colors + Thinner 1  :  9

Note: the mixing ratio may vary depending on user's demand